Polyethylene Glycol,Polyethylene Glygcol,Poly Ethylene Glycol,Polyethylene Glycol Series Jiangsu Zhongluman New Material Technology Co., Ltd , https://www.rozhmch.com
Qt6-15 Price Concrete Block Machine Mumbai (45 set in India)
**QT6-15B Full-Automatic Fly Ash Brick Making Machine**
**Model No.:** QT6-15B
**Method:** Hydraulic Pressure
**Product:** Bricks
**Condition:** New
**Raw Material:** Cement, Fly Ash, Sand, Dust, and More
**Voltage:** 380V
**Warranty:** 1 Year
**Main Market:** India, Vietnam, Indonesia, Middle East, and More
**Trademark:** Dongyue
**Transport Package:** Suitable for Sea Transportation
**Specification:** CE, ISO9001, SGS
**Origin:** Shandong Province, China
**HS Code:** 8474809090
---
### **1. Main Parameters of QT6-15B**
| Parameter | Specification |
|----------|---------------|
| Dimensions of Host Machine | 2850 × 2200 × 2850 mm |
| Host Machine Power | 32 kW |
| Moulding Area | 800 × 600 mm |
| Vibration Force | 45 kN |
| Moulding Time | 15–20 seconds |
| Capacity | 91.55 KVA |
| Pallet Size | 940 × 830 × 20/25 mm |
| Mixer Model | JS500 |
| Weight of Host Machine | 11.5 Tons |
| Water Consumption | 8 T/day |
---
### **2. Production Capacity**
| Brick Size (L x W x H) | Pcs/Mould | Pcs/Hr | Pcs/8 Hr | m³/Year |
|------------------------|-----------|--------|----------|---------|
| 400 × 100 × 200 | 12 | 2160–2880 | 17280–23040 | 41472–55296 |
| 400 × 150 × 200 | 8 | 1440–1920 | 11520–15360 | 41472–55296 |
| 400 × 200 × 200 | 6 | 1080–1440 | 8640–11520 | 41472–55296 |
| 400 × 250 × 200 | 4 | 720–960 | 5760–7680 | 34560–46080 |
| Paver: 200 × 100 × 60 | 24 | 3740 | 29920 | - |
| Paver: 200 × 163 × 60 | 9 | 1450 | 11600 | - |
---
### **3. Required Area**
- **Work Area:** 150–200 m², requiring 6–8 workers
- **Total Area:** 2000 m² (theoretical), can be adjusted based on your needs
---
### **4. Raw Material Requirements**
1. 8%–10% cement, 30%–40% sand, 50%–60% stone (less than 15 mm)
2. 8% cement, 60% sand, 30% fly ash, 2% gypsum
---
### **5. Advantages Over Other Companies**
1. We have an office in India, making service support more efficient.
2. Spares are available in India for quick replacement.
3. Our engineers and operators are trained in China to ensure quality support.
4. We provide pre-installation, project report, layout, and import guidance from our Indian office.
5. No agents involved, so you get better value for money.
6. Warranty is provided directly from India.
7. Service and upgrades are supported from India.
8. All machines supplied to India come with 415V, 3-phase, 50Hz systems, and high-quality Siemens or ABB motors.
9. PLCs are from Siemens or Mitsubishi, ensuring reliability and warranty support in India.
10. Largest pallet size among similar machines, ensuring higher efficiency and durability.
---
### **6. Price Overview of QT6-15B in India**
- **Batching Plant:** The starting point of the production process, includes 3 loading bins and 1 weighing bin, controlled by PLC.
- **Screw Conveyor (Optional):** Transports fly ash or cement from silos to the batching plant.
- **Conveyor Belt:** Carries mixed materials from the batching plant to the mixer.
- **Concrete Mixer:** Mixes all ingredients, controlled by PLC with automatic water addition.
---
### **7. Raw Materials Used**
- **Fly Ash:** Available free of charge from thermal power plants. High quality available locally.
- **Cement (OPC):** Offers faster strength and consistent quality compared to lime. Widely available through local cement companies.
- **Sand / Crusher Dust:** Used as a filler to improve brick strength. Both are locally available.
---
### **8. Working Process**
The process involves mixing fly ash, cement, gypsum, and sand in a semi-wet form using a pan mixer. The mix is then transported via conveyor belt to the molding machine. The machine applies vibration and hydraulic pressure to produce bricks. After casting, the bricks are stacked and cured for 7 days before being ready for delivery.
---
### **9. Installation Schedule**
1. **Day 0:** Advance payment made to the company (India or China).
2. **Day 3:** Civil drawings and list of Indian procurement issued.
3. **Day 30:** Machine tested and ready in China.
4. **Day 35:** Balance payment cleared.
5. **Day 40:** Packing and container loading completed.
6. **Day 45:** Shipped to the Indian port.
7. **Day 60:** Civil works and infrastructure ready.
8. **Day 67:** Goods delivered to the site.
9. **Day 68:** Arrived at the Indian port.
10. **Day 70:** Electrical connections and panels installed.
11. **Day 72:** Support staff prepared for operation.
12. **Day 75:** Engineers arrive on-site for installation.
13. **Day 82:** Commissioning and final installation complete.
*Note: We can also train operators at our Bhubaneswar factory or send them on a short-term basis.*
---
### **Images of QT6-15B Concrete Block Making Machines in India**
[Image 1](http://i.bosscdn.com/uploads/92/c4/29/0417784723a3c1e0134315ae72.jpg)
[Image 2](http://i.bosscdn.com/uploads/34/c3/a1/c017a642a1469455d584e60c22.jpg)
[Image 3](http://i.bosscdn.com/uploads/2a/9a/49/b333a65338529de454451583c6.jpg)
[Image 4](http://i.bosscdn.com/uploads/04/53/ce/90c5da6fd4e2b72b8553f2b9d0.jpg)
[Image 5](http://i.bosscdn.com/uploads/68/1e/f9/14fb993755c3b4ed16f04be444.jpg)
[Image 6](http://i.bosscdn.com/uploads/c8/a7/41/142692a02bff5415185deed56d.jpg)